Weekend Road Work Along Bridge Street And Douglas Street

This weekend, Bridge Street will be closed between David Street and Gorge Road East from 7 a.m. to 3:30 p.m. on Saturday and from 7 a.m. to approximately 5 p.m. on Sunday for paving. Bridge Street will remain open from Bay Street to David Street. Flaggers and signage will direct drivers during this time as traffic detours will be in place.  

Also on Saturday, contractor crews will continue work to install a new water main at the Douglas Street and Finlayson Street intersection from 7 a.m. to 7 p.m. The work will result in single lane traffic in all directions and some delays can be expected during this time.

Signage, lighting and traffic control personnel will be onsite to help direct drivers and cyclists. The water main installation is expected to be completed by mid-July.

People who drive cars and ride bikes are encouraged to use alternate routes if possible.